Fence Companyin Lancaster, CA
A fence company in Lancaster answers to two offices. Building & Safety requires no permit for residential fences up to 7 feet, but Planning sets heights, which a code mirror reads as 4 feet in front yards and 6 feet in side and rear yards. Chain link is barred on homes, and pool barriers need 5 feet. Confirm heights first.

Fence installation in Lancaster is a zoning question and a soil question at the same time. The Census Bureau's 2024 estimates count 53,646 housing units, about 72 percent of them detached houses, with two thirds of occupied homes owner-occupied and a median owner-occupied value of $473,800. Most were built from 1980 to 2009, years in which the census population rose from 48,027 in 1980 to 97,291 in 1990 and 173,516 in 2020. That suggests a city of single-family tracts, where most fence jobs replace or extend a boundary that already exists.
MDG Builders (CSLB #1040337) is a general contractor in Tarzana. For a fence we measure the run, check the rules with the City and manage a licensed fence subcontractor (CSLB class C-13) or, for block walls, a masonry specialist (C-29), and you can ask for each one's license number and certificate of insurance. Materials and prices are on our fencing page, and the rest of the work we manage in town is on the Lancaster overview. Palmdale is the one close neighbor with its own rules; the guides for Los Angeles, Glendale and Pasadena describe cities with very different overlays, so do not carry their numbers over.
What Lancaster's zoning code, Building & Safety and the pool barrier sheet say about fences
Where fencing permits come from in Lancaster: City of Lancaster Community Development, Building & Safety Division (Permit Technician staff).
- The City's permitting FAQ says Building & Safety does not require permits for residential fences under 7 feet tall, that Planning may have other requirements depending on location, and that Planning keeps fence guidelines in the Municipal Code. The permit page lists fences not over 7 feet high as exempt from a building permit.
- The Planning FAQ lists fences and walls among the projects that require Planning approval, along with signage, building additions, new construction and conditionally permitted uses, and says to contact Planning if unsure.
- Under Lancaster Municipal Code 17.08.130 (read on a code-publisher mirror, text as of October 4, 2026), a residential fence, hedge or wall at or behind the property line may be 4 feet high in a front yard or corner-lot side yard and 6 feet high in a side or rear yard. A director's review can approve up to 25 percent more height.
- The same section keeps fences and walls behind the property line and behind utilities (or at least 12 feet behind the face of the curb), measures height from finished grade at the base, treats hedges as fences, and bars chain link, barbed wire, razor wire, electric fences and glass on residential property. Vacant lots may use temporary fencing, including chain link, with a director's review.
- For new subdivisions of 3 or more lots, the mirrored text requires a masonry wall up to 6 feet along rear and side yards, and subdivision perimeter walls must be masonry 5 to 6 feet tall; painted concrete block is not acceptable for the perimeter walls.
- Municipal Code 17.28.030 and 17.28.050 (mirror) apply fence height limits to hedges in required yards and set a 17-foot visibility triangle at street intersections where nothing may obstruct sight between 3.5 and 8 feet above ground.
- Lancaster's permit page says a block wall or retaining wall needs a permit application, plot or site plans approved by Community Development, and stamped, signed engineered calculations approved by Building & Safety. Retaining walls not over 4 feet tall measured from the bottom of the footing are exempt unless they support a surcharge.
- Lancaster's swimming pool barrier handout cites Municipal Code 8.04.200: any pool or body of water deeper than 2 feet used for swimming needs a fence or wall at least 5 feet high measured from the outside, no more than 2 inches of clearance under it, and no openings that pass a 4 inch sphere.

How tall can a fence be in Lancaster?
We read Lancaster's fence height rule on a code-publisher mirror of Municipal Code 17.08.130, because the City's own Municode copy would not open for us. It allows a residential fence, hedge or wall at or behind the property line to stand 4 feet high in a front yard or on the street side of a corner lot, and 6 feet high in a side or rear yard. Height is measured from finished grade at the base, and a director's review can approve up to 25 percent more.
Treat those numbers as a starting point, not a quote. Confirm the limit for your lot with Planning at planning@cityoflancasterca.gov before ordering materials. Building & Safety's FAQ says residential fences under 7 feet need no building permit, while its permit page lists fences not over 7 feet as exempt, so a fence of exactly 7 feet is a question for the counter. Note the gap: a 7 foot fence can be exempt from a building permit and still be taller than the zoning code allows.
Hedges count as fences, so a tall front hedge faces the same 4 foot limit. Two more mirrored rules shape the layout: the fence must stand behind the property line and behind utilities, or at least 12 feet behind the face of the curb, and near a street corner nothing may block the 17-foot visibility triangle between 3.5 and 8 feet above ground.
Ask Planning for the height limit in writing, with your parcel number.

Does fence installation in Lancaster need a building permit?
For a typical wood, vinyl or iron fence, usually not from Building & Safety. Planning is a separate door: its FAQ lists fences and walls among the projects that need Planning approval and says to contact Planning if unsure. We ask both offices before we price a run longer than a few panels.
When a permit is needed, the Citywide Fee Schedule effective October 1, 2026 lists a non-masonry fence or freestanding wall at $88 for the first 100 linear feet and a masonry one at $204. The schedule does not say which fences those lines cover. Because low fences are exempt, they presumably apply to taller or masonry work, so ask for the fee in writing. Applications run through the Accela portal, and fee estimates arrive by email from the permit technicians, (661) 723-6144, within 24 hours.
If a fence went up without a permit it needed, the City's FAQ tells owners to ask the permit technicians for a Code Enforcement permit, bring the violation notice and apply to legalize the work. Only an owner who lives at the property, or a licensed contractor with a City business license, can be issued a permit.

Is chain link allowed on a Lancaster home, and what can you build instead?
On residential property, no, as we read the mirrored text of 17.08.130. It bars chain link, barbed wire, razor wire, electric fences and glass, which removes the cheapest option on many price lists. Vacant lots are the exception: a director's review can approve temporary fencing there, including chain link. If a quote for a house shows chain link, ask which section allows it.
That leaves wood, vinyl, ornamental iron or aluminum, and masonry. Wood and vinyl privacy runs are the usual picks, and ornamental iron suits a front yard that has to stay open at 4 feet. We found no independent price source for horizontal slat fences, so we print no slat price. The mirror also bars glass; ask Planning whether that means broken glass set on a wall or also glass panels, before you plan a glass section.
New subdivisions follow a stricter rule. For tracts of three or more lots, the mirrored text calls for a masonry wall up to 6 feet along rear and side yards, makes subdivision perimeter walls masonry 5 to 6 feet tall, and says painted concrete block is not acceptable for the perimeter walls. As we read them, those are obligations on a new tract's developer, not rules for replacing a fence in an existing yard.

Block walls, retaining walls and Lancaster's soil: what needs an engineer?
A block wall is a different permit from a wood fence. Lancaster's permit page says a block wall or retaining wall needs a permit application, plot or site plans approved by Community Development, and stamped, signed engineered calculations approved by Building & Safety. Retaining walls not over 4 feet tall, measured from the bottom of the footing, are exempt unless they support a surcharge. The fee schedule lists a retaining wall at $269 for the first 100 linear feet.
The ground adds engineering reasons. The City's design sheet puts parts of Lancaster within 10 kilometers of the San Andreas Fault and assigns Seismic Design Category D, E or F, and a USGS model of the Lancaster subbasin simulates subsidence across almost all of it, with a maximum near 9.4 feet by 2005. That report concerns groundwater and says nothing about fences, so we claim no damage from it. It does suggest that a wall's footing should be designed by an engineer who has checked the soil, not copied from a neighbor.
Wind and dust matter too. A solid panel catches more wind than a board fence with gaps, so ask for post depth, footing size and spacing in writing. Digging is earth-moving, and the Antelope Valley air district's Rule 403 bars dust beyond the property line and requires earth-moving to stop or soil to be watered when gusts pass 25 mph.

What does a Lancaster pool fence have to look like?
The City's swimming pool barrier handout cites Municipal Code 8.04.200: any pool or other body of water deeper than 2 feet used for swimming needs a fence or wall at least 5 feet high measured from the outside, with no more than 2 inches of clearance under it and no openings that pass a 4 inch sphere. Five feet is taller than the 4 foot front-yard limit, so ask Planning how the two rules fit where a pool barrier faces the street.
The City also lists Swimming Pool/Spa Enclosure Requirements on its forms page, which we did not read as a full sheet, so ask for the current version. State law adds its own layer: Health and Safety Code section 115922 requires a permit for a new or remodeled pool to include at least two of seven drowning-prevention features, and the enclosure must meet section 115923. We did not read 115923, so we do not print its height.
Design with the sphere test in mind: vertical pickets spaced to stop a 4 inch sphere, a bottom gap of 2 inches or less, and a gate built to the same limits. Ask the fence builder to show how each dimension is met before the order is placed.

Who pays for a shared fence in Lancaster, and where does the line fall?
California's Good Neighbor law, Civil Code section 841, presumes that adjoining owners share the cost of a boundary fence in equal parts, and it asks the owner who wants the work to give the neighbor 30 days' written notice before incurring costs. The presumption can be rebutted. Lancaster's own rules do not decide who pays, only where a fence may stand, which is behind the property line.
Know the line before you dig. In older tracts with block walls, a boundary wall can sit on one side of the line, and only a survey tells you which. We suggest stakes from a licensed surveyor for any shared fence or wall, because moving a finished run costs more than the survey.
Lancaster began as a railroad town: the City's history page says the Southern Pacific reached the valley in 1876 and M.L. Wicks bought railroad land for the townsite in 1884. Most boundary lines you see today were drawn much later, in tract maps from the growth years, so check the recorded map for your lot rather than assuming the old fence marks the line.

How much does a fence company charge for fence installation in Lancaster?
We found no Lancaster fence price survey. One cost page for Lancaster printed three different ranges, from $1,272 to $6,017 in one place and $1,600 to $4,000 in another, without saying how long the fence was. The better data is for Los Angeles: Angi's August 2026 page puts the average near $29 per linear foot, with a range of $15 to $60, and our fencing page settles on about $25 to $55 per foot for a 6 foot wood or vinyl privacy fence and $35 to $85 for ornamental iron or aluminum, built from Angi, HomeGuide, Thumbtack and Fixr.
For a 100 foot backyard run that means roughly $2,500 to $5,500 installed, before gates, which Angi's national page prices at $150 to $2,000, and before removing an old fence at $3 to $5 per foot. The Bureau of Labor Statistics put fence erectors in the Los Angeles area at a mean $28.00 an hour in May 2025, so labor is a large share of the bill. Permit fees, if any, are separate lines.
Fences fall under CSLB class C-13, which excludes masonry walls; those are C-29. Ask a bidder which license covers which part of a job that mixes both, and read our article on how general contractors use subcontractors. Under Business and Professions Code 7159 a deposit is capped at $1,000 or 10 percent, whichever is less, and our guide to checking a contractor's license shows how to verify the number.

Fence and gate photos from Lancaster and nearby communities
Six fence scenes tied to Lancaster neighborhoods such as South Lancaster and Westside and to nearby communities such as Quartz Hill and Desert View Highlands, from wood privacy runs to metal pool barriers.



Where the fence numbers come from
Every per-foot figure we use for Lancaster comes from Los Angeles sources, and each one is named in the table on the fencing cost page. Permit fees are not in those numbers. The sources disagree at the low end, so read the figures as a planning range and get a measured, written proposal for your run. A fence often goes up after a new roof or a fresh coat of paint, so see roof repair in Lancaster and house painting in Lancaster.
| What it covers | Typical range |
|---|---|
| Wood or vinyl privacy fence, 6 feet | $25 to $55 per linear foot |
| Chain-link | $12 to $30 per linear foot |
| Aluminum or ornamental iron | $35 to $85 per linear foot |
| Typical 100-foot backyard run | $2,500 to $5,500 total |
| Block walls, horizontal slat fences, gates and openers, hillside lots | Set by the written proposal |
Lancaster fence questions, answered
How much should I pay for a fence installation in Lancaster?
For a 6 foot wood or vinyl privacy fence, plan on roughly $25 to $55 per linear foot installed, or about $2,500 to $5,500 for a 100 foot run, based on the Los Angeles sources listed on our fencing page. We found no Lancaster survey. Gates, old fence removal and any permit fee are separate lines, so a measured written proposal is the real price.
How much does 200 ft of fencing cost?
At the same $25 to $55 per foot for wood or vinyl, 200 feet would run about $5,000 to $11,000 installed. Ornamental iron or aluminum at $35 to $85 per foot would come to about $7,000 to $17,000. These are Los Angeles benchmarks, not a Lancaster quote, and corners, gates and slopes move them.
Do I need a permit to build a fence in Lancaster?
Usually not from Building & Safety, which says residential fences under 7 feet need no permit, but Planning has height and location rules and lists fences among the projects it reviews. Block walls and retaining walls do need permits and engineered calculations. Call the permit technicians at (661) 723-6144 or email Planning before you order.
How tall can a fence be in Lancaster?
A code-publisher mirror of Municipal Code 17.08.130 reads 4 feet in a front yard or corner street side and 6 feet in a side or rear yard, with a director's review for up to 25 percent more. We could not open the City's own copy, so confirm the limit with Planning before building.
Can I put up a 7 ft fence in Lancaster?
Probably not as a plain yard fence, even though Building & Safety exempts fences up to 7 feet from a building permit. The mirrored zoning text caps side and rear yard fences at 6 feet, and a director's review can add up to 25 percent, which would reach 7.5 feet. Ask Planning whether your lot qualifies.
Can I put up a chain link fence at my Lancaster house?
No, as we read the zoning text: Municipal Code 17.08.130 on the mirror bars chain link, barbed wire, razor wire, electric fences and glass on residential property. Temporary chain link is allowed on vacant lots with a director's review. Choose wood, vinyl, iron, aluminum or masonry instead, and confirm the rule with Planning.
Does my neighbor have to pay for half the fence in California?
Usually yes, by presumption. Civil Code section 841 presumes that adjoining owners share the cost of a boundary fence equally, and it asks for 30 days' written notice before you incur costs. The presumption is rebuttable, and Lancaster's permit rules never decide who pays.
What if I don't get a permit to build a fence in Lancaster?
For an exempt fence nothing is missing, but for a block wall or other permitted work the City can require you to legalize it. Its FAQ tells owners to ask the permit technicians for a Code Enforcement permit, bring the violation notice and apply. First plan review usually takes 2 to 3 weeks.
How tall does a pool fence have to be in Lancaster?
At least 5 feet, measured from the outside. The City's pool barrier handout cites Municipal Code 8.04.200 for any pool or body of water deeper than 2 feet used for swimming, with no more than 2 inches of clearance under the barrier and no openings that pass a 4 inch sphere. Ask Planning how that fits the 4 foot front-yard limit.
What are the new fence rules in California in 2026?
We found no new state fence statute for 2026 that we can cite. What changed is paperwork: the 2025 California codes became mandatory on January 1, 2026, Lancaster's fee schedule updated October 1, 2026, and Business and Professions Code 7159 was amended effective January 1, 2026. A state Zone 0 ember-resistant rule has been reported, but sources conflict on its status, so we leave it out.
Plan your fence project in Lancaster
Send the address, the length you want to enclose and whether any part faces the street, a pool or a neighbor. We check the height and permit questions with the City before we call back.