Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Fencing in Monterey Park

Fence Companyin Monterey Park, CA

Quick answer

A fence company in Monterey Park works to a 4 foot limit in the required front yard and 6 feet elsewhere, per the City's fence application. Planning clears a site plan before work starts, and a neighbor must sign for a shared line. The building permit rule is conflicting across the City's texts, so confirm it with the counter.

CSLB #1040337 5.0 on Houzz Free written estimate
Horizontal slat redwood fence with a matching gate along a modern backyard with gravel and grasses, fencing in Garvey Ranch Park, Monterey Park
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Fences here wrap a city of single-family blocks. The Census Bureau's 2024 five-year estimates count 12,881 detached houses, 58.2 percent of 22,134 housing units, with a median year built of 1963, and the City's housing page says about 65 percent of Monterey Park is zoned for single-family housing. Most of those lots were laid out in the postwar subdivisions of the 1950s, so a typical job replaces a worn rear line, a front yard wall that predates today's limits or a gate on a narrow older driveway, often on clay or a slope.

On a fence, MDG Builders (CSLB #1040337) is the general contractor that gathers the property line, the site plan and the neighbor's signature, files with the City and sequences the work, while a licensed fence subcontractor builds it. Our fencing page carries the sourced price table and the Monterey Park overview lists the other trades. Rules start at the City's Planning Division, and nearby Alhambra and Montebello set different front yard limits.

Fencing rules in Monterey Park

What Monterey Park's fence application, zoning handouts and building code say

  • The City's Residential Fence Application (July 2026) caps walls, fences and hedges at 4 feet in the required front yard, measured from the front property line, and at 6 feet anywhere else on the lot; decorative metal such as wrought iron may add up to 6 inches. Planning reviews a site plan for setbacks and zoning compliance before work starts, and the site plan checklist cites Municipal Code section 21.08.080(R).
  • Chain-link fencing is prohibited in the front yard, and barbed wire (including cyclone fencing and the like), electrified equipment (other than gate operators) and chicken wire used with a fence or wall are prohibited.
  • A fence on a shared property line needs the neighboring owner's signature on the application, and the City leaves property line disputes to civil law and tells owners to hire a licensed surveyor. Walls, fences or hedges built or planted within 3 feet of each other are measured as a single unit.
  • Engineering requires a 25 by 25 foot sight triangle at corner lots in which solid fences cannot exceed 30 inches, with taller open fencing allowed only if it keeps visibility clear between 30 and 60 inches above roadway grade. Full-height walls must begin outside the triangle, and clear sight lines must be kept at driveway exits.
  • No wall, fence, gate, column or landscaping may block a fire hydrant, a 3-foot clear radius must be kept around hydrants, and no walls, footings or columns may be built in public utility, drainage, access or Fire Department easements. Fences must stay out of the public right-of-way, and Engineering confirms the clearance.
  • The Outdoor Walls page and Planning FAQ say the standard maximum front yard wall is 4 feet (4.5 feet in some cases), walls of 6 feet or higher are discouraged because they block police sight lines, and a simple site plan and wall elevation must receive planning clearance at City Hall before work starts.
  • The R-1 handout repeats that a wall, fence or hedge of up to 6 feet is allowed along side and rear lot lines and 4 feet in the required front setback area.
  • Building permit exemption: the 2019-cycle administrative provisions (Ordinance 2165, section 105.2) exempt fences not over 6 feet high and retaining walls not over 4 feet (measured from the bottom of the footing to the top of the wall). The City's 2015 plan check bulletin still lists fences, retaining walls and block walls as needing plan check, and the 2016-cycle text exempted masonry walls only up to 4 feet, so confirm the current rule with the counter.
Sources for these rules
  1. montereypark.ca.gov: Residential Fence Regulations Application July 2026
  2. montereypark.ca.gov: Outdoor Walls
  3. montereypark.ca.gov: R1 DEV STANDARDS Revised june
  4. montereypark.ca.gov: 10224
A wooden table with rolled blank site plans, a clipboard, fencing near Monterey Park in Montebello
Front yard

How tall can a fence or wall be in a Monterey Park front yard?

Four feet, measured from the front property line, in the required front yard. The City's July 2026 Residential Fence Application caps walls, fences and hedges at 4 feet there and at 6 feet anywhere else on the lot, and lets decorative metal such as wrought iron add up to 6 inches. The Outdoor Walls page gives the standard front wall maximum as 4 feet, 4.5 in some cases, and the R-1 handout repeats the 6 foot side and rear limit. Walls, fences or hedges built or planted within 3 feet of each other are measured as one unit, so a low wall with a tall hedge close behind it is judged together.

Three materials are off the table. Chain link is prohibited in the front yard, and barbed wire (including cyclone fencing), electrified equipment other than gate operators and chicken wire used with a fence or wall are prohibited anywhere. The City also discourages walls of 6 feet or more because they block police sight lines.

A white wooden picket fence with a matching gate along the front yard of a California bungalow, fencing in Monterey Park Historical, Monterey Park
Permit

Does a Monterey Park fence need a permit, and what is the site plan clearance?

Planning clearance comes first, and it is firm. Planning reviews a site plan for setbacks and zoning before work starts, and for walls it also wants a wall elevation; the City's checklist cites Municipal Code section 21.08.080(R). Planning is at 626-307-1315 and books counter appointments online.

The building permit answer is not settled. The 2019 ordinance (number 2165, administrative section 105.2) exempts fences not over 6 feet and retaining walls not over 4 feet measured from the bottom of the footing. The 2016 text exempted masonry walls only up to 4 feet and other fences to 7 feet, and the City's August 2015 plan check bulletin still lists fences, retaining walls and block walls as needing plan check. A December 2025 notice says the 2025 codes were adopted, but we did not find that ordinance. Building & Safety takes walk-ins Monday through Thursday mornings, so ask there before treating any fence as exempt.

Fence posts set in concrete footings and braced, a string line stretched along them, fresh soil, fencing near Monterey Park in Alhambra
Soil and slopes

What do expansive clay and hillside slopes do to a Monterey Park fence?

The City calls the soils in Monterey Park predominately expansive, meaning clay that swells when wet, and says drainage and irrigation strongly affect how well properties hold up. Its prescriptive footing standard of 15 by 24 inches is written for buildings up to two stories, not fences, so ask the fence builder how deep and wide the post holes are and what keeps water from pooling at each one. UC Integrated Pest Management advises termite-resistant wood or concrete footers where wood meets soil, and the City's own findings call the region especially susceptible to termites.

Slopes add a second layer. The Safety Element says hillside soils in the Monterey Hills and Repetto Hills have failed in storms and earthquakes, and 22 of 212 sample points inside the city fall in State earthquake-induced landslide zones. A retaining wall that holds a slope is not a fence, and a Public Works grading permit applies if cut and fill exceed 50 cubic yards. Section 9.54, as the City cites it, requires slope drains to stay unobstructed, so no footing or panel should block one.

A stepped wood fence following a sloped hillside lot, each panel level and the posts plumb, fencing in Garvey Reservoir, Monterey Park
Sight lines

Where do corner lots, driveways and fire hydrants limit a Monterey Park fence?

Engineering requires a 25 by 25 foot sight triangle at corner lots. Inside it, solid fences cannot exceed 30 inches, and taller open fencing is allowed only if it keeps visibility clear between 30 and 60 inches above the roadway. Full height walls must start outside the triangle, and driveway exits need clear sight lines too.

No wall, fence, gate, column or plant may block a fire hydrant, and a 3 foot clear radius stays open around it. Footings and columns are not allowed in public utility, drainage, access or Fire Department easements, and fences must stay out of the public right-of-way, which Engineering confirms. A driveway gate has to clear all of this, and a gate operator is the one electrified item the City permits. We did not find which license class wires an operator, so ask the bidder who does.

Black wrought iron fence and driveway gate in front of a stucco house with palms, fencing near Monterey Park in San Gabriel
Neighbors

Who pays for a shared fence in Monterey Park, and who has to sign?

A fence on a shared property line needs the neighboring owner's signature on the City's application, so the neighbor conversation comes before the permit, not after. The City leaves property line disputes to civil law and tells owners to hire a licensed surveyor, which is good advice before anyone orders panels.

Cost sharing is state law, not city law. California Civil Code section 841 presumes that adjoining owners benefit equally from a boundary fence and share its cost, with 30 days' written notice before costs are incurred, and the presumption can be rebutted. Section 841.4 treats a fence built maliciously and unnecessarily over 10 feet as a private nuisance. Neither section overrides the City's 6 foot limit, so a neighbor's request for a taller fence still goes through Planning.

Wooden survey stakes with orange flagging tape and a string line marking a property line along a backyard, fencing in Monterey Park City Hall, Monterey Park
Cost

How much does fence installation cost in Monterey Park?

No Monterey Park survey turned up, so no local price is printed. Angi's Los Angeles page, updated August 4, 2026, gives an average of $3,051 (typical $1,734 to $4,422) and $15 to $60 a linear foot, with a 100 foot run at $2,100 to $2,350, wood at $1,600 to $2,500 and vinyl at $1,850 to $3,400. Those 100 foot rows work out to about $21 to $24 a foot, below Angi's $29 average, because averages include small and complex jobs. HomeGuide's $20 to $60 and Thumbtack's national $23 to $57 overlap that range.

The labor check is the federal wage survey: fence erectors in the Los Angeles area averaged $28.00 an hour in May 2025. On a Monterey Park lot, ask each bidder to price these separately:

  • Footing depth and concrete on clay soil
  • Removal and disposal of the old fence
  • Stepped or racked panels on a hillside lot
  • Gates, hardware and any gate operator
  • A survey when the property line is unclear
Fence material samples leaning against a stucco wall: a cedar picket, fencing near Monterey Park in Rosemead
Hiring

How do I hire a fence company in Monterey Park, and what about block walls?

Wood, vinyl and metal fences fall under CSLB class C-13 Fencing, which excludes masonry walls. Block and stucco walls are C-29 Masonry, so the bidder for a block wall needs a different license. Look up whichever applies with our contractor license guide. A home improvement contract over $500 must follow Business and Professions Code 7159, and the down payment is limited to $1,000 or 10 percent of the price, whichever is less.

On an MDG job, we handle the site plan package, the neighbor signature and the City filing, and a licensed subcontractor builds. Ask for the subcontractor's license number and certificate of insurance, and see how general contractors use subcontractors for who answers for what. Write the Planning clearance into the contract as a step that happens before the first post hole.

Stucco-covered block wall with a smooth cap and a wooden pedestrian gate, a street tree and a sidewalk, fencing in Barnes Memorial Park, Monterey Park
Recent work

Fence and gate photos from Monterey Park and nearby communities

Seven fence scenes tied to Monterey Park streets and to nearby communities such as Alhambra and Rosemead, from low front yard iron to rear privacy runs, driveway gates and stepped hillside panels.

A black powder-coated steel pool fence with square pickets and a latch gate beside a lawn and a modern ho, fencing near Monterey Park in South Pasadena
A corner of a wood backyard fence being stained, fencing in Cascades Park, Monterey Park
A gas post-hole auger beside a straight row of freshly dug post holes along a yard, fencing near Monterey Park in South El Monte
Cost

Where the Monterey Park fence figures come from

Each per-foot range is a Los Angeles or national figure with its source and date in the table on our fencing price page, and permit and planning fees are not in those numbers. Fences often follow other exterior work, so see roof repair in Monterey Park and house painting in Monterey Park, and compare the rules in Los Angeles.

Fencing price ranges used for Monterey Park estimates (Southern California sources, before permits)
What it coversTypical range
Wood or vinyl privacy fence, 6 feet$25 to $55 per linear foot
Chain-link$12 to $30 per linear foot
Aluminum or ornamental iron$35 to $85 per linear foot
Typical 100-foot backyard run$2,500 to $5,500 total
Block walls, horizontal slat fences, gates and openers, hillside lotsSet by the written proposal
FAQ

Monterey Park fence company and fence installation questions, answered

How tall can a fence be in the front yard?

In Monterey Park the limit is 4 feet in the required front yard, measured from the front property line, and 6 feet elsewhere on the lot, with up to 6 extra inches for decorative metal such as wrought iron. Planning clears a site plan before work starts, and chain link is prohibited in the front yard. Hedges count toward the same limits.

Do I need a permit to build a fence in my front yard?

You need Planning clearance, and the building permit is a separate question the City's texts answer differently. Planning reviews a site plan before work starts. The 2019 ordinance text exempts fences not over 6 feet, while the 2015 plan check bulletin lists fences as needing plan check, so confirm with the counter at 626-307-1300.

Can I put up a 7ft fence?

Not on a typical Monterey Park lot, where the City limits fences to 6 feet on side and rear lines and 4 feet in the required front yard. The 2016 ordinance text exempted fences up to 7 feet from a building permit, but that is a permit threshold, not a height allowance. Ask Planning at 626-307-1315 about any exception.

What happens if I don't have a permit for a fence?

The City's Code Compliance division aims first for voluntary compliance and can escalate to correction notices, administrative citations, public nuisance hearings, abatement warrants or prosecution. A fence over the height limit or inside a sight triangle can be ordered corrected. We found no City answer on adding a permit after the work, so ask the counter.

Does your neighbor have to pay for half the fence in California?

Usually the presumption says yes for a boundary fence. Civil Code section 841 treats adjoining owners as benefiting equally and sharing the cost, with 30 days' written notice before costs are incurred, and the presumption can be rebutted. In Monterey Park the neighbor must also sign the City's application for a fence on the shared line.

How much should a 100 ft fence cost?

Angi's Los Angeles page, updated August 4, 2026, shows $2,100 to $2,350 for a 100 foot run, and its $15 to $60 per foot range puts a 100 foot fence anywhere from $1,500 to $6,000 depending on material and site. Clay soil, a slope, gates and old fence removal push a job upward. Monterey Park has no local survey.

Is it cheaper to install a wood or vinyl fence?

On Angi's Los Angeles figures wood runs lower, at $1,600 to $2,500 against $1,850 to $3,400 for vinyl. Vinyl avoids the termite exposure the City's code findings describe, so ask bidders to compare life and upkeep, not only the first price. In Monterey Park either material is capped at 4 feet in the front yard.

Can you install fences on hillsides or steep slopes?

Yes, with stepped or racked panels and deeper footings, but Monterey Park adds checks. The Safety Element records hillside soil failures and puts 22 of 212 sample points in earthquake-induced landslide zones, and slope drains must stay clear under Section 9.54. Ask for the post depth and a drainage plan, and keep footings out of easements and drains.

What is the maximum height of a retaining wall without a permit in California?

The state model list exempts retaining walls up to 4 feet measured from the bottom of the footing, unless they carry a surcharge, and Monterey Park's 2019 text repeats the 4 foot figure. The City's 2015 bulletin still lists retaining walls for plan check, so confirm with the counter. A wall that holds a slope is an engineering question, not a fence.

Do you need a permit to build a block wall in California?

In Monterey Park, plan on Planning clearance and ask about the building permit. The 2016 ordinance text exempted masonry walls only up to 4 feet, the 2019 text exempts fences up to 6 feet, and the 2015 bulletin lists block walls for plan check. Masonry is C-29 work, not C-13 fencing, so the bidder needs the right license.

Free estimate

Start a fence quote in Monterey Park

Send the address, the length and height you want, whether it runs along the front, a side or the rear, and whether a neighbor shares the line. We build the site plan and signature steps into the quote before anyone digs.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224