Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Kitchen Remodeling in Upland

Kitchen Remodelingin Upland, CA

Quick answer

An Upland kitchen remodel needs no building permit for cabinets, countertops, painting or tile, but moving walls, gas, plumbing or wiring is not on the City's exemption list. Permits are filed online only, inspections run Monday through Thursday and a Waste Management Plan applies to remodels.

CSLB #1040337 5.0 on Houzz Free written estimate
Finished bright kitchen in a California home: white shaker cabinets, quartz island with waterfall edge, kitchen remodeling in Upland
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

Most Upland kitchens date from the postwar boom. Wikipedia's census table shows 9,203 residents in 1950, 15,918 in 1960 and 32,551 in 1970, after the San Bernardino Freeway opened in 1954 and growers sold citrus land to developers. ACS 2024 one-year estimates count 28,366 housing units with a median year built of 1978, about 52.7 percent built before 1980 and 4,874 before 1960, and the median owner-occupied value is $802,100 (the 5-year file says $739,400). A historic core of houses from roughly 1890 to the 1930s sits inside nine local districts, so a kitchen here can be 48 years old or well over 90.

For a kitchen, MDG Builders (CSLB #1040337) defines the scope, finds out which City review applies and coordinates the trades, with separate licensed subcontractors for plumbing, electrical, cabinets and tile. The kitchen remodeling page holds our sourced cost tiers and the Upland overview lists every trade we manage here. Two San Bernardino County neighbors set their own terms, which you can read in the guides for Ontario and Rancho Cucamonga. Permits come from the City's Building and Safety Division. The Municipal Code host, ecode360, answered with an HTTP 403 error, so the code sections below were read in GoCodebook, a third-party mirror stamped October 4, 2026, and the City has the final word.

Kitchen Remodeling rules in Upland

What Upland's exemption list, water code and historic chapter say about kitchens

Where kitchen remodeling permits come from in Upland: City of Upland Development Services Department, Building and Safety Division.

  • Permit line for a kitchen: cabinets, countertops, painting, tiling, carpeting and similar finish work are exempt under RMC 15.04.050 (unless required to be accessible), so a cosmetic kitchen refresh is exempt, but moving walls, gas, plumbing, electrical circuits or mechanical work is not on the exemption list; no kitchen-specific handout was found on the City site, so submittal contents come from the City's Plan Check Submittal Form and Submittal and Plan Preparation Minimum Guidelines (Land Development page). (read in GoCodebook's third-party code mirror, text as of 2026-10-04)
  • Water-saving fixtures (RMC Chapter 13.20): when the owner of a single-family home or apartment building replaces a plumbing fixture it must be replaced with a water-conserving fixture, defined in the chapter as toilets at 1.6 gallons per flush, showerheads at 2.5 gallons per minute and bathroom and kitchen faucets at 2.2 gallons per minute; exceptions include fixtures that cannot be retrofitted further, fixtures where reduction would threaten health, safety or the historical value of a structure (documented by affidavit), and retrofits that cannot reach a three-year payback. (read in GoCodebook's third-party code mirror, text as of 2026-10-04)
  • Waste Management Plan: the Land Development page requires a WMP for renovation or remodeling of an existing residential structure, so a permitted kitchen remodel can expect to file the WMP form.
  • Licensed trades: RMC 15.04.070 requires a valid California contractor's license of the correct classification to pull a permit unless the Building Official approves an owner-builder permit for a single-family home, so a kitchen remodel with licensed subcontractors under a general contractor follows the normal path.
  • Construction hours and noise: demolition and alteration of a building are limited to 7:00 a.m. to 6:00 p.m. on weekdays (RMC 9.40.M); plan around those hours for kitchen demolition, and inspections are Monday through Thursday only, by voicemail request by 4:00 p.m. the day before. (read in GoCodebook's third-party code mirror, text as of 2026-10-04)
Sources for these rules
  1. gocodebook.com: chapter 15.04 california administrative code
  2. gocodebook.com: chapter 13.20 water conservation retrofit
  3. uplandca.gov: waste management plan
  4. gocodebook.com: chapter 9.40 unnecessary noise
A wooden table with rolled blank drawings, a clipboard, kitchen remodeling near Upland in Montclair Transit Center
Older kitchens

What is behind the walls of an Upland kitchen built before 1980?

Age decides the surprises. ACS 2024 counts 14,948 units built before 1980, and the median year of 1978 means a typical kitchen has seen almost five decades of use. EPA's Renovation, Repair and Painting rule covers paid work that disturbs paint in homes built before 1978, and the ACS table cannot separate 1978 from 1979, so we give no count for that year alone.

South Coast AQMD Rule 1403 covers asbestos in demolition and renovation. Its survey must cover every layer of flooring down to the joists, resilient floor covering counts when it is asphalt or vinyl tile or sheet vinyl with more than 1 percent asbestos, and the rule excludes an owner-occupant who personally renovates a single-unit home. The survey requirement does not apply to a single-unit renovation removing less than 100 square feet of asbestos-containing material. Rule 403 limits fugitive dust beyond the work area. Ask your contractor how old flooring, adhesive and paint will be tested and contained.

Have any testing priced as its own line before demolition starts.

A 1950s California kitchen during demolition with a wall opened to bare studs showing old cloth-covered w, kitchen remodeling in Madonna of the Trail, Upland
Exempt or permitted

Do I need a permit to replace kitchen cabinets and countertops in Upland?

No, if that is all the job does. RMC 15.04.050, as the mirror shows it, exempts painting, tiling, carpeting, cabinets, countertops and similar finish work unless it is required to be accessible. Moving a wall, a gas line, a plumbing line, an electrical circuit or mechanical work is not on the list, so a kitchen that relocates the range or the sink needs a permit even when the cabinets alone would not.

We found no kitchen handout on the City site. Submittal contents come from the Plan Check Submittal Form and the Submittal and Plan Preparation Minimum Guidelines on the Land Development page. RMC 15.04.070 asks for a contractor license of the correct classification before a permit issues, with an owner-builder exception for a single-family home that the Building Official must approve. We did not read any fee amounts, only that fees follow a Council-adopted schedule and that a plan review fee is paid when the documents are filed.

Close detail of custom kitchen cabinetry: inset shaker doors, soft-close drawers, brass pulls, kitchen remodeling near Upland in Graber Olive House, Ontario
Filing and inspections

How do kitchen permits and inspections work in Upland when City Hall is closed Fridays?

Everything starts online. The Building and Safety page says all applications go through the Citizen Self Service Portal, which takes them at any time, and the counter keeps Monday through Thursday hours of 8:00 a.m. to 5:00 p.m. Inspections are requested on the voicemail line, (909) 931-4129, by 4:00 p.m. the business day before, with the address, permit number, inspection type and AM or PM. They run Monday through Thursday, times are not guaranteed and no confirmation is sent, so call (909) 931-4110 that morning.

The 2026 closure list adds December 28 through 30, when permits are not reviewed, and Thursday, December 31. Demolition and alteration of a building are limited to 7:00 a.m. to 6:00 p.m. on weekdays under RMC 9.40.M. One conflict needs a question: the City's page says the 2025 California Building Code is adopted, yet the mirror shows the 2022 editions of the building, residential, energy and green codes. Ask Building and Safety which edition governs your filing date.

Book rough plumbing and electrical inspections for Monday to Thursday and plan the Friday gap.

A kitchen gutted to the studs: new wall framing, rough plumbing lines and electrical boxes visible, kitchen remodeling in Upland High School, Upland
Fixtures and waste

What water-saving, energy and waste plan rules apply to an Upland kitchen remodel?

RMC Chapter 13.20 requires that when the owner of a single-family home or apartment building replaces a plumbing fixture, the new one must be water-conserving, which the chapter defines for kitchen and bathroom faucets as 2.2 gallons per minute. Exceptions cover fixtures that cannot be retrofitted further, fixtures where a reduction would threaten health, safety or the historical value of a structure, documented by affidavit, and retrofits that cannot reach a three-year payback. A violation is a misdemeanor with a 72 hour written-notice cure period.

A permitted remodel also expects a Waste Management Plan, because the Land Development page lists renovation and remodeling of an existing residential structure among the projects that need one. We found no diversion percentage or deposit. The 2022 California Energy Code is adopted without local amendment in the mirror, and state rules on range hood exhaust and kitchen lighting controls exist, but we did not confirm which ones reach an alteration, so ask the plan checker.

Range wall of a kitchen: stainless gas range, plaster range hood, zellige tile backsplash, kitchen remodeling near Upland in San Antonio Heights
Walls and additions

Can I take out a wall, bump out the kitchen or add a second kitchen in Upland?

A load-bearing wall removal is not exempt and needs plans through the portal. For a bump-out, the City's FAQ says to call Planning at (909) 931-4130 first to verify zoning, setbacks and any historic designation. Lot coverage caps run from 35 percent in RS-20 and RS-15 to 40 percent in RS-10, 45 percent in RS-7.5 and 50 percent in RS-4. We did not read front and side setbacks, and we did not open the County Fire District's remodel sprinkler thresholds.

A second kitchen is another matter. A guest house may not have a kitchen, although a wet bar with under 10 square feet of counter, a sink no larger than 15 by 15 inches and a refrigerator under 5 cubic feet is allowed under RMC 17.19.050. A full second kitchen belongs to a legal ADU, which Upland approves ministerially within 60 days of a complete application. Homes within 250 feet of Euclid Avenue meet RS-4 standards and a 45 CNEL interior sound limit, and airport compatibility review applies in the Cable and Ontario influence areas.

A 1950s California ranch house kitchen opened to the dining room after a wall was removed, kitchen remodeling in Old San Antonio Hospital, Upland
Historic homes

How does historic review affect a kitchen remodel in the older part of Upland?

Mostly through the exterior. The City's preservation page says it is exterior changes that alter a resource's appearance that need a Certificate of Appropriateness, and a kitchen can reach the outside through a new window, a bump-out, a vent or a roofline. For a registered, surveyed or district-contributing home, an addition is a major alteration reviewed against the Secretary of the Interior's Standards, with findings on mass, proportions, setbacks and window openings.

The code also offers help. The State Historical Building Code, in its 2019 edition, is adopted at RMC 15.32.020 and may be used for registered resources, and RMC 17.26.050 lists possible permit fee reductions for work that meets the Standards. The faucet rule has a historic exception by affidavit as well. We did not confirm that interior-only kitchen work is outside review, so ask Planning to say so in writing.

Ask Planning whether the address has a designation before drawings are made.

A historic California Craftsman bungalow kitchen with original wood windows, kitchen remodeling near Upland in Montclair Place, Montclair
Cost and hiring

How much does a kitchen renovation cost in Upland, and who should I hire?

Upland has no price survey that we could find, so the figures come from Los Angeles. In Remodeling magazine's Cost vs. Value 2025 report for Los Angeles, a midrange minor kitchen is $29,765, a midrange major one $86,214 and an upscale major one $171,369. Thumbtack's Los Angeles estimate, refreshed July 13, 2026, runs $12,471 to $40,909, while the 2026 Houzz study of 10,176 U.S. homeowners found a national median of $24,000. Our planning tiers are about $25,000 to $45,000 for a same-layout refresh, $45,000 to $90,000 for new cabinets, counters and appliances, and $90,000 to $170,000 and up for upscale or layout-changing work.

A kitchen draws on several license classes, including plumbing C-36, electrical C-10, cabinets C-6 and tile C-54. California Business and Professions Code 7159 limits the down payment to $1,000 or 10 percent of the contract price, whichever is less. Read the California kitchen cost guide, then how general contractors use subcontractors and our license guide.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling in Carnegie Library, Upland
Recent work

Kitchen photos from Upland and nearby communities

Kitchen scenes tied to Upland places such as Historic Downtown Upland, Euclid Avenue, College Park and Upland Hills, and to nearby communities such as Montclair, Claremont, Ontario and Rancho Cucamonga, from demolition and framing to cabinets, hoods and finished islands.

A historic California Craftsman bungalow kitchen with original wood windows, kitchen remodeling near Upland in Montclair Place, Montclair
A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling in Carnegie Library, Upland
Kitchen island with three counter stools and pendant lights, kitchen remodeling near Upland in John Rains House
Cost

Where these Upland kitchen figures come from

The kitchen remodeling page lays out each cost tier with its source, including the figures that do not agree. A kitchen job often comes with exterior work, and Upland's rules for it are on the roofing page, the fencing page and the painting page. To see a Los Angeles County review process next to this one, compare the kitchen guide for Glendale.

Kitchen Remodeling price ranges used for Upland estimates (Southern California sources, before permits)
What it coversTypical range
Refresh in the same layout: new counters, sink, lighting, hardware, paint and limited cabinet work$25,000 to $45,000
Full remodel in the same layout: new cabinets, counters, appliances, flooring and lighting$45,000 to $90,000
Upscale remodel or layout change: custom cabinets, premium appliances, a moved wall, relocated plumbing or gas$90,000 to $170,000 and up
FAQ

Upland kitchen remodeling questions, answered

Do I need a permit to remodel my kitchen in Upland?

Not for finish work alone. Cabinets, countertops, painting and tile are exempt, but moving walls, gas, plumbing or electrical circuits is not on the exemption list. Applications go through the online CSS Portal, and contractors need a license of the correct class unless the Building Official approves an owner-builder permit.

Do I need a permit to replace kitchen cabinets and countertops in Upland?

No. The City's exemption list covers cabinets, countertops and similar finish work unless required to be accessible. The exemption ends where the job reaches plumbing, wiring, gas or walls, so a relocated sink or a new range circuit brings a permit even if the cabinet swap by itself would not.

Can I move my stove or sink without a permit in Upland?

No. A moved sink changes plumbing and a moved range changes gas or electrical lines, and none of that is on the exemption list. Expect a permit filed online, rough inspections requested by voicemail before 4:00 p.m. the day before, and a water-conserving faucet at 2.2 gallons per minute.

How do I get a permit for a kitchen remodel in Upland?

File through the Citizen Self Service Portal, because Building and Safety takes no paper applications. Include the plan check submittal form, plans that show the work and the contractor's license, and pay the plan review fee when the documents are filed. Questions go to (909) 931-4110 from Monday through Thursday.

How much does a kitchen renovation cost in Upland?

We found no Upland survey. Cost vs. Value 2025 shows $29,765 for a midrange minor remodel and $86,214 for a midrange major one in Los Angeles, and Thumbtack's Los Angeles range is $12,471 to $40,909. Our tiers run from $25,000 to $170,000 and up, and a written proposal fixes the price.

Can I remodel a kitchen for under $30,000?

Yes, when the layout stays put. Cost vs. Value 2025 puts a midrange minor kitchen in Los Angeles at $29,765, and Thumbtack's range starts at $12,471. Opening a wall or relocating gas and plumbing lifts the cost. With no Upland survey, a measured proposal is the only reliable number.

Can I remove a wall between my kitchen and living room in Upland?

Usually yes with a permit and plans. A load-bearing wall needs structural design, and the portal filing goes to plan check. Call Planning first if the work adds floor area, and ask Building and Safety about the code edition, because the City says 2025 codes while the mirror shows 2022.

What order should a kitchen remodel go in?

Demolition and framing, then rough plumbing, electrical and gas, inspected before walls close. Then come drywall, paint and flooring, with cabinets, counters, backsplash and appliances last. Because Upland inspects only Monday through Thursday on a prior-day request, schedule the rough inspections early and order long-lead cabinets around them.

Does lead paint or asbestos matter in an older Upland kitchen?

It can. EPA's lead rule covers paid work that disturbs paint in homes built before 1978, and South Coast Rule 1403 sets asbestos practices for renovation, with an owner-occupant exclusion. About 52.7 percent of Upland's units were built before 1980, so ask how flooring and paint will be tested.

Can I add a second kitchen or wet bar in Upland?

A wet bar yes, a second kitchen only as an ADU. Upland's code lets a guest house have a wet bar under 10 square feet of counter with a small sink and a refrigerator under 5 cubic feet, but no kitchen. A full second kitchen belongs to a legal ADU, approved within 60 days.

Free estimate

Ask for a kitchen estimate in Upland

Name your part of Upland, roughly when the house was built and whether walls, plumbing or windows will move. We find out which City review applies, and whether the home is historic, before we call you back.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224