Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Kitchen Remodeling in San Bernardino

Kitchen Remodelingin San Bernardino, CA

Quick answer

A San Bernardino kitchen remodel needs no permit for cabinets, countertops, painting or tile, but moving gas, wiring, plumbing or walls does. Most plan check happens in person at 201 North E Street, and the City publishes no turnaround time. A permit with no inspection progress for 180 days is presumed abandoned.

CSLB #1040337 5.0 on Houzz Free written estimate
A 1950s California ranch house kitchen opened to the dining room after a wall was removed, kitchen remodeling in Our Lady of the Rosary, San Bernardino
CSLB #1040337Verified at CSLB
5.0 on HouzzRated by clients
Written proposalsScope and price in writing
Licensed specialistsSubcontractors do the work

San Bernardino kitchens come mostly from two eras. ACS 2024 one-year estimates count 68,594 housing units, with 14,038 built in the 1950s, 8,772 in the 1960s, 8,849 in the 1970s and 12,745 in the 1980s, so about 63 percent of homes started with a kitchen that is at least 46 years old, remodeled or not. The Housing Element ties the postwar tracts in the north central and Del Rosa areas to railroad, Norton Air Force Base and Kaiser Steel jobs, and says the newest, highest priced homes are in Verdemont.

For a kitchen, MDG Builders (CSLB #1040337) acts as the general contractor: we define the scope, find out which City review applies and line up the trades, with a separate licensed subcontractor for plumbing, electrical, cabinets and tile. The kitchen remodeling page holds our sourced cost tiers, the San Bernardino overview lists every trade we manage here, and the guides for Riverside and Corona show how two neighboring Inland Empire cities handle the same work. The City's Building & Safety Division issues permits. The Municipal Code host returned an HTTP 403 error to us, so code sections below come from GoCodebook, a third-party mirror, and the City has the final word.

Kitchen Remodeling rules in San Bernardino

What San Bernardino's exemption list, plan check rules and overlays say about kitchens

Where kitchen remodeling permits come from in San Bernardino: City of San Bernardino Community Development & Housing Department, Building & Safety Division.

  • Cabinets, countertops, painting, tiling and carpeting are permit-exempt finish work in San Bernardino, but any kitchen remodel that moves gas, electrical or plumbing needs a permit: the City offers a separate Mechanical, Electrical or Plumbing Permit Application for projects whose scope is only those trades and says all structural, electrical, plumbing, heating and air-conditioning work needs a permit with few exceptions.
  • Rental kitchens: single-family rentals, duplexes and triplexes are inspected biennially under the Single-Family Rental Property Inspection Program, which the City says also helps identify illegal rental units; a legal second unit with its own kitchen goes through the ADU chapter instead.
Sources for these rules
  1. sanbernardino.gov: Building Safety Division
  2. sanbernardino.gov: Single Family Rental Property Inspection
A wooden table with rolled blank drawings, a clipboard, kitchen remodeling near San Bernardino in Muscoy
Exempt work

Do I need a permit to replace kitchen cabinets and countertops in San Bernardino?

No. The City's exempt list names painting, tiling, carpeting, cabinets, countertops and similar finish work, so swapping boxes, tops and flooring with no pipe, wire or wall changes needs no building permit. The City points to California Building Code 105.2 and Residential Code R105.2 for the complete list.

The moment the work moves gas, electric or plumbing, a permit is required. Building & Safety offers a separate Mechanical, Electrical or Plumbing Permit Application for jobs that are only those trades, and says all structural, electrical, plumbing, heating and air-conditioning work needs a permit with a few exceptions. Contractors need a state license and a current City business license, while an owner who lives in a one- or two-family home may pull a permit only by doing the work personally.

Ask your contractor which line items in the proposal are permit work and which are exempt finish work.

Close detail of custom kitchen cabinetry: inset shaker doors, soft-close drawers, brass pulls, kitchen remodeling in Downtown San Bernardino, San Bernardino
Plan check

How does plan check work for a San Bernardino kitchen, and how long does it take?

Most plan check in San Bernardino is in person. The City does not take plans or applications by courier, mail or email, apart from expedited residential solar and EV charging, and it asks for three printed sets at least 24 by 36 inches, two copies of supporting papers such as structural or energy calculations, and a wet-stamped cover sheet on any architect or engineer plan. Small jobs such as a water heater swap or a panel upgrade are usually issued over the counter.

The City publishes no plan-check turnaround on any page we read, so we print no number and treat a promised timeline as a guess. The counter at 201 North E Street opens Monday, Tuesday and Thursday 8 am to 5 pm, Wednesday 10 am to 5 pm and Friday 8 am to 4 pm, with last sign-in for permit issuance at 4:30 pm Monday to Thursday and 2:30 pm Friday. In March 2026 Public Works asked for outside plan check and permit technician help, which shows workload but is not a Building & Safety turnaround.

Range wall of a kitchen: stainless gas range, plaster range hood, zellige tile backsplash, kitchen remodeling near San Bernardino in Colton
Walls

Can I take out a kitchen wall in San Bernardino, and what is the 180 day rule?

A wall that carries load means structural plans, and the City says a California registered architect or engineer is required for plans in certain circumstances, though we found no published list, so ask at the counter. In the high liquefaction areas on the General Plan map, Municipal Code 15.08 asks for a registered civil engineer's report when a structural modification passes 25 percent of the building area, but only for listed building types such as buildings over two stories or assembly rooms over 50 people. A one-story house does not appear on that list.

Municipal Code 15.04.050 adds a 180 day clock: with no inspection and no substantial progress to the Building Official in any 180 day period, the work is presumed abandoned and the permit expired. A long cabinet lead time is therefore a scheduling issue as well as a cost one, so ask when the rough inspections will be booked relative to the order date.

A kitchen gutted to the studs: new wall framing, rough plumbing lines and electrical boxes visible, kitchen remodeling in San Bernardino County, San Bernardino
Older kitchens

What should I expect behind the walls of a 1950s to 1980s San Bernardino kitchen?

The Housing Element says at least half the housing stock is 50 years old or more, that City staff estimate 7 to 10 percent of homes need major repair and up to 20 percent moderate repair, and that no recent housing condition survey exists. We found no San Bernardino source on wiring or pipe types, so the practical step is to have the electrician and plumber look at what runs through the kitchen walls before the proposal is final, and to price any rework as a separate line.

EPA's lead-safe rule applies to paid work that disturbs paint in homes built before 1978, and ACS 2024 counts 62.6 percent of units before 1980. South Coast AQMD Rule 1403 sets work practices for asbestos in demolition and renovation, and it treats a single-unit house differently from apartments and condominiums. Until tested, assume old flooring, wall texture and paint are unknown.

Ask for allowances in writing for anything found behind the walls, with a price per item.

A 1950s California kitchen during demolition with a wall opened to bare studs showing old cloth-covered w, kitchen remodeling near San Bernardino in Highland
Rentals and second kitchens

Can I remodel a kitchen in a San Bernardino rental, or add a second kitchen?

ACS 2024 shows 48.3 percent of occupied homes are rented, and the City estimates 30 percent of single-family homes are rentals. Single-family rentals, duplexes and triplexes are inspected every two years under the rental program, which the City says also helps identify illegal units. A remodel in a rental is ordinary permit work, and owner approval comes first for a tenant. In a condo, association rules come before the City, and we did not research them.

A second kitchen is not a remodel. A legal second unit with its own kitchen goes through the ADU chapter, Development Code 19.04.030(2)(P), where applications are ministerial and the City must decide within 60 days of a complete application or the application is deemed approved unless the applicant asks for a delay. Our ADU construction page explains that route.

A small bright rental apartment kitchen freshly updated with white shaker cabinets, kitchen remodeling in California Theatre of the, San Bernardino
Overlays

How large can a kitchen remodel get in a foothill or flood area before the house is treated as new?

Two overlays count percentages. In the foothill and Very High fire zones, Municipal Code 15.10.040 says repairs reaching 60 percent of replacement cost trigger a retrofit of the whole structure. Replacement windows there must have welded vinyl corners, metal reinforcement in the interlock, dual-pane glass with at least one tempered pane and AAMA lineal certification, so a kitchen window change-out is not an off-the-shelf swap.

In a FEMA flood area, the Flood Plain Overlay treats work costing 50 percent or more of a structure's market value as a substantial improvement, and then the lowest floor, including a basement, must sit at or above base flood elevation certified by a registered engineer. A kitchen alone may not reach that line, but a kitchen counted with a bath, an addition and a roof can. The City's flood zone page and the County Fire District's map viewer are the two places to check an address.

Kitchen island with three counter stools and pendant lights, kitchen remodeling near San Bernardino in Highland Historic District
Cost and hiring

How much does a kitchen renovation cost in San Bernardino, and who should I hire?

No San Bernardino price survey turned up, so the numbers come from Los Angeles. Remodeling magazine's Cost vs. Value 2025 report lists $29,765 for a midrange minor kitchen, $86,214 for a midrange major one and $171,369 for an upscale major one, and Thumbtack's Los Angeles page, updated July 13, 2026, shows $12,471 to $40,909. The 2026 Houzz study of 10,176 U.S. homeowners reports a national median of $24,000. For scale, the median owner-occupied home in San Bernardino is worth $461,400 (ACS 2024). We plan on about $25,000 to $45,000 for a same-layout refresh, $45,000 to $90,000 for a full remodel with new cabinets, counters and appliances, and $90,000 to $170,000 and up for upscale or layout-changing work.

A kitchen draws on several licenses, among them plumbing C-36, electrical C-10, cabinets C-6 and tile C-54, and Business and Professions Code 7159 caps a down payment at $1,000 or 10 percent of the price, whichever is smaller. Read the California kitchen cost guide, then how general contractors use subcontractors and our license guide before you sign.

Finished bright kitchen in a California home: white shaker cabinets, quartz island with waterfall edge, kitchen remodeling in San Bernardino Santa Fe Depot, San Bernardino
Recent work

Kitchen photos from San Bernardino and nearby communities

Kitchen scenes tied to San Bernardino places such as Perris Hill, Del Rosa, Verdemont and the Medical Center area, and to nearby communities such as Colton, Rialto, Highland and Loma Linda, from demolition and framing to cabinets, hoods and finished islands.

Kitchen island with three counter stools and pendant lights, kitchen remodeling near San Bernardino in Highland Historic District
Finished bright kitchen in a California home: white shaker cabinets, quartz island with waterfall edge, kitchen remodeling in San Bernardino Santa Fe Depot, San Bernardino
A historic California Craftsman bungalow kitchen with original wood windows, kitchen remodeling near San Bernardino in Rialto
Cost

Where these San Bernardino kitchen figures come from

Each kitchen cost tier, with its source and the figures that conflict, is laid out on the kitchen remodeling page. Kitchen work often sits beside outside jobs, and the San Bernardino rules for those are on the roofing page, the fencing page and the painting page. To see a different review process beside this one, compare the kitchen guide for Glendale.

Kitchen Remodeling price ranges used for San Bernardino estimates (Southern California sources, before permits)
What it coversTypical range
Refresh in the same layout: new counters, sink, lighting, hardware, paint and limited cabinet work$25,000 to $45,000
Full remodel in the same layout: new cabinets, counters, appliances, flooring and lighting$45,000 to $90,000
Upscale remodel or layout change: custom cabinets, premium appliances, a moved wall, relocated plumbing or gas$90,000 to $170,000 and up
FAQ

San Bernardino kitchen remodeling questions, answered

Do I need a permit to remodel my kitchen in San Bernardino?

For finish work alone, no. Cabinets, countertops, painting and tile are on the City's exempt list. Moving gas, electrical or plumbing needs a permit, and structural changes need plans through in-person plan check. Contractors also need a state license and a current City business license.

Do I need a permit to replace kitchen cabinets and countertops in San Bernardino?

No. The City lists cabinets, countertops, painting, tiling and carpeting as exempt finish work. The exemption stops where the job touches plumbing, wiring, gas lines or walls, so a new sink location or range circuit brings a permit even if the cabinets alone would not.

How long does plan check take for a kitchen remodel in San Bernardino?

The City publishes no plan-check turnaround on the pages we read, so we cannot give days. Small jobs such as water heaters and panel upgrades are usually issued over the counter, while kitchens with structural changes go through in-person plan check at 201 North E Street. Ask for the expected review time in writing.

Can I move my stove or sink without a permit in San Bernardino?

No. Moving a sink changes plumbing and moving a range changes gas or electrical lines, and the City says all structural, electrical, plumbing and mechanical work needs a permit with few exceptions. The Mechanical, Electrical or Plumbing Permit Application covers jobs that are only those trades.

How much does a kitchen renovation cost in San Bernardino?

We found no San Bernardino survey. Remodeling magazine's Cost vs. Value 2025 report shows $29,765 for a midrange minor remodel and $86,214 for a midrange major one in Los Angeles, and Thumbtack shows $12,471 to $40,909. Our tiers run $25,000 to $170,000 and up, and a written proposal is the real price.

Can I remodel a kitchen for under $30,000?

Yes, for a refresh that keeps the layout. Cost vs. Value 2025 prices a midrange minor kitchen in Los Angeles at $29,765, and Thumbtack's Los Angeles range runs from $12,471 to $40,909. Moving walls, plumbing or gas pushes the price up. We found no San Bernardino survey, so a measured proposal sets the number.

Can I remove a wall between my kitchen and living room in San Bernardino?

Usually yes with a permit and plans. A load-bearing wall needs structural design, the City says an architect or engineer is required for plans in certain circumstances, and plan check is in person. In a high liquefaction area or foothill zone, extra review may apply, so ask the counter about your parcel.

What order should a kitchen remodel go in?

Demolition and any framing come first, then rough plumbing, electrical and gas, which are inspected before walls close. Drywall, paint and flooring follow, then cabinets, counters, backsplash and appliances. Because a San Bernardino permit is presumed abandoned after 180 days without progress, line up inspections before ordering long-lead cabinets.

Does lead paint or asbestos matter in an older San Bernardino kitchen?

It can. EPA's rule covers paid work that disturbs paint in homes built before 1978, and South Coast Rule 1403 sets asbestos work practices for demolition and renovation. ACS 2024 counts 62.6 percent of the City's homes before 1980, so ask your contractor how old materials will be tested and contained.

Can I add a second kitchen for an in-law unit in San Bernardino?

Only as a legal ADU or junior ADU, which goes through Development Code 19.04.030(2)(P). Applications are ministerial, and the City must approve or deny within 60 days of a complete application. A second kitchen added without that approval is the kind of illegal unit the City's rental inspection program looks for.

Free estimate

Ask for a kitchen estimate in San Bernardino

Name your part of town, roughly when the house was built and whether walls, plumbing or windows will move. We find out which City review applies before we call you back.

Free estimate · A real person answers · (888) 666-8224

Call (888) 666-8224