Roof repair in Chino should be treated as permit work, because the City's exempt-work lists never mention re-roofing, and any replacement must be equal to or better than the covering removed. New homes need Class A clay or concrete tile. Call the Building Division at 909-334-3251 before a small patch.

Chino's roofs come from three different Chinos. The oldest is the farm town the City's Housing Element describes, incorporated in 1910 and built mostly north of Schaefer Avenue around agriculture, dairies, Chino Airport and the California Institution for Men. The second is the 1970s suburb: the same document says the SR 60 location made Chino one of the first inland cities to feel the move out of the coastal counties, and the housing stock doubled. The third is newer land that used to be farms and dairies, led by The Preserve. Census Bureau ACS 2024 five-year estimates count 28,188 homes with a median build year of 1987. The 1970s are the biggest decade at 5,970 homes (21.2 percent), about 37.6 percent went up before 1980 and 1,051 since 2020. The median owner-occupied home is worth $683,400.
For a re-roof, MDG Builders (CSLB #1040337) works as the general contractor: we measure the scope, find out what the Building Division wants to see and keep the schedule, while a licensed C-39 roofing subcontractor does the tear-off and installation. Our roofing page has the sourced prices, the Chino overview lists every trade we manage here, and the roofing guides for Ontario and Eastvale show how two neighbors treat the same job. The permit office is the City's Building Division. The official Municode copy of the code blocked our researcher, so the code sections below come from GoCodebook, a third-party mirror last updated October 4, 2026, and the City should confirm each one.
What Chino's roofing material rule, fire code and nuisance chapter say about roofs
Where roofing permits come from in Chino: City of Chino Development Services Department, Building Division.
- Roofing material rule (Municipal Code 20.17.040(I)): new homes use clay or concrete tile with a Class A fire rating (developments of four or fewer homes may use a 30-year laminated shingle with Class A rating where neighbors are not tile); when replacing a roof the new material must be equal to or better than the material removed, as the Director of Community Development determines; wood shake or shingle must be replaced with at least a 30-year laminated Class A composition shingle; the Director may grant exceptions if matching would require significant structural alteration; color must suit the neighborhood.
- Permit status: the exempt-work lists in 15.04.180 and 15.06.030 do not mention re-roofing or roof repair, the Building Division FAQ lists re-roofs among the work with permit fees, and fees are charged by valuation (fee schedule effective July 1, 2026), so plan on a building permit and confirm at 909-334-3251.
- Layers: the City's Building FAQ (revised 1/15/2020) says the California Building Code allows one additional layer of asphalt composition roofing over the existing one, for a total of two layers; combined with 20.17.040(I), a tear-off versus overlay choice should be checked with the Building Division.
- Roof loads and wind: the City lists a 110 mph basic wind speed with Exposure C, zero ground snow load and a minimum roof load per CBC Table 1607A.1, and the municipal findings cite Santa Ana wind gusts of 90 miles per hour and temperatures above 100 F as reasons for the fire and wind amendments (15.01.010).
- Solar on roofs: Municipal Code 15.46.010 sets a streamlined review for small residential rooftop systems (38.4 kW AC or less, on a single or two-family home, not above the legal building height), requires the applicant to verify the roof structure and the electrical panel in advance, and accepts email, online portal or SolarAPP+ submittals; 20.10.070 permits roof-mounted panels with a zoning clearance and, on single-family homes, requires equipment other than panels and conduit to be screened from the front elevation. Photovoltaic permit fees are listed in the schedule (a $450 base fee capped at $500 plus $15 per kW above 15 kW as printed).
- Chimneys and fire: Municipal Code 15.32.230 requires an approved spark arrester (openings between 3/8 and 1/2 inch, net free area at least four times the flue outlet, 12-gauge steel wire or equivalent) on chimneys serving solid-fuel appliances, and 15.31 applies WUI roof and vegetation rules in WUI areas and high hazard zones; the roof tear-off should also consider SCAQMD Rule 1403 if asbestos-containing material is disturbed.
- A roof that is damaged, dilapidated, leaking into sheathing or rafters, missing material or substantially dissimilar to surrounding properties is a declared nuisance under Municipal Code 8.50.040(B), and the energy upgrade form lists roofing among measures that count toward the 10 percent set-aside on $65,000 or larger alterations.
Sources for these rules
- gocodebook.com: chapter 20.17 design standards
- gocodebook.com: chapter 15.04 building code
- cityofchino.org: Building Division Frequently Asked Questions PDF
- cityofchino.org: City of Chino Ordinance and Design Criteria PDF
- gocodebook.com: chapter 15.46 rooftop solar energy systems
- gocodebook.com: chapter 15.32 fire code
- gocodebook.com: chapter 8.50 maintenance of real property

Does Chino require Class A tile, and can I change my roof material?
New homes in Chino use clay or concrete tile with a Class A fire rating under Municipal Code 20.17.040(I). The one exception is a development of four or fewer homes, which may use a 30-year laminated shingle rated Class A where the neighbors are not tile. Class A is the top rating in the ASTM E108 and UL 790 fire tests. The clause that touches existing houses is the replacement rule: a new covering must be equal to or better than the one removed, and the Director of Community Development decides what counts as better.
Two limits follow. Wood shake or wood shingle has to be replaced with at least a 30-year laminated composition shingle rated Class A, so wood cannot come back. The Director may also grant an exception when matching the old material would require significant structural alteration, and the color has to suit the neighborhood. We found nothing that says whether a shingle may replace tile, so treat tile to shingle as a request for a written ruling, not a choice you can assume.
Ask the counter for the material ruling in writing before you order tile or shingles.

Does a roof repair or roof replacement in Chino need a building permit?
Plan on one. The exempt-work lists in Municipal Code 15.04.180 and 15.06.030 name sheds, low walls, painting, cabinets and flatwork, but they never mention re-roofing or roof repair, and the Building Division's FAQ lists re-roofs among the work with permit fees. That is an inference, not a printed rule, so call 909-334-3251 about a small patch. The City keeps the 1997 Uniform Administrative Code as its administrative code and we could not read that text, which is one more reason to ask.
Fees follow job value. The schedule effective July 1, 2026 charges $46.19 plus $9.24 per additional $1,000 for jobs valued from $2,001 to $25,000, adds plan check at 75 percent of the permit fee and a 7.5 percent technology fee, and tacks on smaller percentage fees for art and the general plan. Work begun without a permit can be charged double under Section 15.04.185, and building code violations are misdemeanors under Chapter 15.50, each day counting separately. Inspections are requested online or at 909-334-3252, and a request made before 3 p.m. is scheduled for the next business day. An older FAQ, revised in 2020, puts a permit's life at 180 days, so do not leave a roof half done.
Put the permit decision and the roof area on the proposal before the crew arrives.

Is my Chino roof in a fire hazard zone, and what is the strip along the Prado Basin?
Only a thin southern strip of the city shows up in the State's fire hazard layers. The Chino Valley Independent Fire District adopted CAL FIRE's recommended Local Responsibility Area zones unchanged in Ordinance 2025-01, effective September 1, 2025, but its map viewer would not load for us. So we laid CAL FIRE's Phase 4 layer over the Census boundary of Chino ourselves. This is our own overlay of the State layer, not an official City map. It shows about 2.0 square miles Very High, 0.3 High and 0.5 Moderate against about 24.1 NonWildland, and all of the Moderate to Very High land sits south of the main housing on the Prado Basin side.
Downtown, College Park, The Preserve and Chino Airport tested NonWildland, while the Yorba-Slaughter Adobe area tested Very High. About 3.1 square miles inside the boundary fall outside the layer and we could not resolve them, and the City's older design sheet, which is undated, says High Fire Hazard Area: No. In a Very High zone, owners keep defensible space and disclose on sale, and new work and additions meet wildland-urban interface standards, which Municipal Code 15.31 adopts with local amendments. New homes already need Class A coverings citywide, so the zone matters most for vegetation and additions.
Ask the Fire District for your parcel's zone in writing at firemarshal@chofire.org.

How old are Chino roofs, and does a 1970s tear-off raise asbestos questions?
Most roofs belong to the 1970s through the 2010s. A roof original to a 1970s house is more than 46 years old, and ACS 2020 to 2024 counts 5,970 of those homes. The 1980s added 4,681, the 1990s 2,099, the 2000s 4,824 and the 2010s 4,925, so roofs from those decades run from about 7 to 45 years. The older tracts north of Schaefer Avenue, now designated CDBG target areas, hold part of the 2,366 homes (8.4 percent) that predate 1960. We found no Chino roof survey and no tile share, so we print no service-life years.
Old roofing also raises dust questions. SCAQMD Rule 1403, amended October 5, 2007, sets survey, notification and handling duties when asbestos is disturbed in building demolition and renovation. Whether it reaches a single-family re-roof is a question for the District at 800-388-2121, so we promise neither answer. The ACS table cannot separate 1978 from 1979, so we print no pre-1978 count for lead. If a tear-off exposes painted fascia or trim on an older house, ask the crew how it handles that paint.
- Curling or cracked shingles, or slipped tile
- Stains or soft spots on a ceiling below
- Granules in the gutters, bare underlayment showing

Can Chino make me fix a leaking roof, and what about solar panels and chimneys?
Yes, roof condition is a code enforcement item. Municipal Code 8.50.040(B) lists a damaged or dilapidated roof, one leaking into sheathing or rafters, one missing material, or one substantially dissimilar to surrounding properties as a nuisance, and treats a broken window or vent the same way. The City's Energy Efficiency for Existing Buildings form counts roofing among the measures that can apply to the 10 percent energy set-aside on an alteration valued at $65,000 or more, so a re-roof inside a larger addition can earn credit.
Solar has a streamlined path. Section 15.46.010 covers rooftop systems of 38.4 kW AC or less on a one- or two-family home, asks the applicant to verify the roof structure and electrical panel up front, and accepts email, the online portal or SolarAPP+. Roof-mounted panels need a zoning clearance under 20.10.070, and equipment other than panels and conduit must be screened from the front of a single-family house. A solid-fuel chimney needs a spark arrester under Section 15.32.230, with openings between 3/8 and 1/2 inch, so a flashing job at the chimney is the moment to check it.
Ask whether the panel reset is its own line on the proposal.

What do 99 hot days, design winds and a 7 a.m. start mean for a Chino tear-off?
Heat and a long dry season set the calendar. Chino Airport, whose NOAA 1991 to 2020 normals are the nearest we found, averages 9.98 inches of rain a year, 7.97 of them from December through March and almost none in July and August. August highs average 96.3 F, about 98.9 days a year reach 90 F and about 23.3 reach 100 F. The City's own findings mention Santa Ana gusts of 90 miles per hour, and its adopted design values are a 110 mph basic wind speed with Exposure C, no snow load and 3.0 inches of rain an hour.
Crews may work from 7:00 a.m. to 8:00 p.m. Monday through Saturday under Municipal Code 15.44.030, with no work on Sundays or federal and state holidays unless the Director of Development Services approves, and construction noise stays exempt only while it holds to 65 dBA on residential property. A summer tear-off wants the cool morning hours, so ask the bidder when the crew arrives and how it protects an opened roof when a gusty forecast appears. We name no best month.

How much does roof replacement cost in Chino, and how do I hire a roofer?
We found no Chino price survey, so these are Los Angeles figures. Angi's Los Angeles roof guide, updated July 31, 2026, reports a typical range of $10,256 to $24,963 and an average of $17,271, with asphalt at $4 to $12 a square foot, tile at $7 to $15 and metal at $7 to $16, plus $1,000 to $3,000 for tear-off and $500 to $1,000 to detach and reset solar panels. Remodeling magazine's Cost vs. Value 2025 report prices one large reference roof in Los Angeles at $36,417 for asphalt and $62,069 for metal, about double Angi because it prices a single big specification rather than averaging real jobs. We plan on about $10,000 to $25,000 for asphalt, $15,000 to $37,000 for tile and $20,000 and up for metal, against a Chino median home value of $683,400.
Roofing is Contractors State License Board class C-39. Business and Professions Code 7159 requires a signed written contract before work, caps the down payment at $1,000 or 10 percent of the price, whichever is less, and includes a box showing whether subcontractors will be used. Our license guide shows the lookup step by step, and how general contractors use subcontractors explains who answers for what on site.

Roofing photos from Chino and nearby communities
Roofing scenes tied to Chino places such as Downtown Chino, College Park, The Preserve and the older tracts north of Schaefer Avenue, and to nearby communities such as Chino Hills, Eastvale, Ontario Ranch and Norco, from tear-offs and underlayment to tile flashing and solar resets.



Where these Chino roof figures come from
Every roofing price, with its source and date, is in the table on the roofing page, and the California roofing cost guide explains the gap between the two Los Angeles sources. Roof jobs often arrive with other exterior or interior work, and the Chino rules for those are on the fencing page, the painting page and the kitchen remodeling page. Neighbors with their own roof rules include Norco and Pomona.
| What it covers | Typical range |
|---|---|
| Asphalt shingle, typical single-family roof | $10,000 to $25,000 |
| Concrete or clay tile | $7 to $15 per sq ft |
| Metal | $7 to $16 per sq ft |
| Remodeling Cost vs. Value 2025, Los Angeles | Asphalt $36,417. metal $62,069. |
| Extras | Tear-off $1,000 to $3,000. solar detach and reset $500 to $1,000. |
Chino roofing questions, answered
Do I need a permit to replace my roof in Chino?
Plan on one. Chino's exempt-work lists do not mention re-roofing, and the Building Division's FAQ lists re-roofs among work with permit fees, so a replacement should be permitted and a small repair should be confirmed by phone at 909-334-3251. Fees run by job value, and starting without a permit can bring a penalty equal to double the permit cost.
What is the 25% rule for roofing?
It is shorthand for rules in some codes that bring a whole roof up to current standards once a set share of it is replaced in a year. We found no such percentage in the Chino code sections we read, but Section 20.17.040(I) requires any replacement to be equal to or better than the old covering. Ask the counter how it treats a partial re-roof.
Does Chino require a Class A roof?
New homes must use Class A clay or concrete tile, and a replacement must match or beat the covering removed, with wood shake replaced by a Class A laminated shingle rated for 30 years. Whether a given repair needs Class A turns on the Director's reading, so put the product's fire rating in the contract.
Can I replace a tile roof with shingles in Chino?
Maybe, but only with the City's agreement. Section 20.17.040(I) requires equal or better material as the Director of Community Development determines, and it allows exceptions when matching would need significant structural alteration. We found no written rule that allows shingles on a tile house, so ask for the ruling in writing first.
Is my Chino roof in a fire hazard severity zone?
Probably not. Our own overlay of CAL FIRE's layer puts all Moderate to Very High land in a southern strip on the Prado Basin side, and test points downtown, in College Park and in The Preserve came out NonWildland. That is not an official City map, so check your parcel in the Fire District's viewer or at firemarshal@chofire.org.
How much does roof replacement cost in Chino?
We found no Chino survey. Angi's Los Angeles guide gives a typical $10,256 to $24,963, with asphalt at $4 to $12 a square foot, tile $7 to $15 and metal $7 to $16, while Cost vs. Value prices a larger reference roof far higher. We plan on about $10,000 to $25,000 for asphalt, and a measured written proposal sets the real price.
What is the best month to replace a roof in Chino?
We cannot name one. Chino Airport's 1991 to 2020 normals show 0.08 inch of rain in July and 0.01 in August against 7.97 inches from December through March, but about 23 days a year reach 100 F. Ask each bidder how the crew handles heat, a gusty forecast and an opened roof deck.
Can I put solar panels back on a new roof in Chino?
Yes. Municipal Code 15.46.010 streamlines small residential rooftop systems of 38.4 kW AC or less and accepts email, portal or SolarAPP+ submittals. Angi's Los Angeles guide puts the detach and reset at $500 to $1,000. Settle in the contract who files which permit, because the panels come off before the tear-off starts.
Does an old Chino roof need an asbestos test before tear-off?
We found no Chino rule that orders a test for a house. SCAQMD Rule 1403 covers asbestos in building demolition and renovation, and whether it reaches a single-family re-roof is a question for the District at 800-388-2121. Ask the roofer whether the old material has been tested.
How do I check a roofing contractor's license in California?
Look up the license number on the Contractors State License Board site, confirm the C-39 roofing classification is active and compare the business name with your contract. If a general contractor manages the job, also ask for the roofing subcontractor's license number and certificate of insurance. Our license guide walks through each step.
Ask for a roof inspection in Chino
Tell us the street or tract, the roof covering, the year the house was built and where water shows inside. Before we call back we check whether the job needs a ruling on material, whether the address touches the fire strip and whether solar panels have to come off.