Cabinet Refacing vs. Replacing: Which Makes Sense for Your Kitchen?
Refacing makes sense when the cabinet boxes are sound and the layout stays, and replacing makes sense when either is not true. Published national figures put refacing at about $5,000 to $13,000 for an average kitchen and replacement at $4,500 to $15,000 or more. Replacement also means new countertops, which is where the real gap opens.
Is it cheaper to reface or replace kitchen cabinets?
Refacing is usually cheaper as a whole job, though not always per foot. Refacing keeps the cabinet boxes and covers them: new doors, new drawer fronts, veneer or laminate over the visible frames, and new hinges and pulls. Because the boxes stay, so do the countertops, the sink and the plumbing connections, and that is most of the saving.
HomeGuide, a cost site that says it tracks millions of estimates homeowners receive from contractors, puts cabinet refacing at $150 to $450 per linear foot, or $5,000 to $13,000 for an average kitchen, on a page last updated in April 2023. The same page puts replacing kitchen cabinets at $4,500 to $15,000 or more. We found no dated Los Angeles source for refacing, so read them as a comparison between the two choices, not as a local quote.
Cabinet refacing and replacement price ranges
National ranges from HomeGuide, with a Fixr figure as a cross-check. All are national figures, and page dates are in the last column.
| What it covers | Typical range | What moves the price |
|---|---|---|
| Refacing, per linear foot | $150 to $450 | Laminate at the low end, solid wood at the high end (HomeGuide, April 2023) |
| Refacing, average kitchen | $5,000 to $13,000 | Door count, material, new drawer boxes and hardware (HomeGuide, April 2023) |
| Refacing, national cross-check | $3,000 to $13,500 (average $8,250) | Fixr, January 2026; method not explained on the page |
| Stock cabinets, installed, per linear foot | $100 to $400 | Box construction, finish, number of drawer bases (HomeGuide, April 2023) |
| Replacing kitchen cabinets, whole job | $4,500 to $15,000 or more | Size of kitchen and cabinet grade; countertops not included (HomeGuide, April 2023) |
| New quartz countertops if boxes are replaced | $1,500 to $8,000 | Square footage, slab grade, cutouts and edges (HomeGuide, December 2023) |
How we got these numbers: HomeGuide's cabinet refacing and quartz countertop pages (last updated April 2023 and December 2023), which say the site tracks millions of contractor estimates, with Fixr's refacing page (updated January 26, 2026) as a cross-check. All figures are national and the HomeGuide pages are over three years old, so confidence is low for Southern California. A written MDG proposal sets the actual price.
Why do refacing prices online run from $500 to $13,500?
Because the sites are not measuring the same job. Thumbtack's cabinet refacing page, last updated July 8, 2026, gives a national average range of $508 to $2,049, with a high end of $5,560. Fixr's page, updated January 26, 2026, gives $3,000 to $13,500 with a national average of $8,250.
We could not confirm the scope behind Thumbtack's low figures, and Fixr's page does not explain its method, so the table above leans on HomeGuide. The practical lesson is to compare bids by linear feet, material and door count, never by a headline average.
A worked example: 25 linear feet of cabinets, priced both ways
Measure the fronts of your upper and lower cabinets along the wall and add them. Say the total is 25 linear feet. Using HomeGuide's 2023 national ranges, refacing comes to 25 x $150 = $3,750 at the low end and 25 x $450 = $11,250 at the high end. New stock cabinets at $100 to $400 per linear foot installed come to 25 x $100 = $2,500 up to 25 x $400 = $10,000.
On those numbers, stock replacement looks no dearer than refacing. The catch is what replacement drags along. Countertops sit on the boxes, so they come off and rarely survive. HomeGuide's quartz page, last updated December 2023, lists $1,500 to $8,000 for an average kitchen. Stock replacement with new quartz is then $2,500 + $1,500 = $4,000 up to $10,000 + $8,000 = $18,000, before the sink is reconnected, the backsplash redone and the walls patched.
So the honest comparison is refacing against replacement plus counters, plumbing and tile. If new counters were already planned, the gap narrows, and our post on quartz versus granite countertops covers that budget.
When does cabinet refacing work well?
When the boxes are worth keeping and the layout already works.
- Boxes are solid plywood or sound face frames, square and firmly attached to the wall.
- The layout, appliance sizes and sink position are staying.
- Countertops are in good shape or were replaced recently.
- Drawer boxes and slides are good, or you are budgeting to swap them.
Open every door and look at the box floors, especially under the sink and beside the dishwasher. Refacing a swollen box hides the damage and does not fix it.
When should you replace the cabinets instead?
When the problem is the box or the plan, not the door. No veneer fixes a cabinet that is the wrong size or in the wrong place, so replacement belongs with a full kitchen remodeling project.
- Water damage, sagging shelves or particleboard that crumbles at the screw holes.
- You are moving the sink, range or refrigerator, or adding an island.
- You want deeper drawers in place of doors and fixed shelves across the base run.
- A wall is coming out, which reshapes the cabinet run. See our post on removing a kitchen wall.
What about painting the cabinets you already have?
Painting is the third choice, and it sits below refacing in both price and change. It keeps the doors and drawer fronts you have, so worn edges, dated door profiles and failing hinges stay unless they are repaired first. A professional painting job on cabinets is mostly preparation: cleaning off kitchen grease, sanding, priming and spraying or brushing in controlled coats.
Sanding old finishes raises a health rule in older houses. The EPA's Renovation, Repair and Painting rule requires anyone paid to disturb painted surfaces in homes built before 1978 to be certified and to follow lead-safe work practices.
Does refacing or replacing cabinets need a permit in California?
It depends on the city, and on what else gets touched. The City of San Diego's Information Bulletin 203, dated July 2024, exempts the relocation of cabinets and countertops in the kitchens of single-dwelling units, duplexes and townhouses from a building permit. The County of San Diego's exemption list, form PDS 110 revised January 1, 2026, exempts painting, papering and similar finish work, and notes that separate electrical, plumbing and mechanical permits may still be required.
For the City of Los Angeles we could not confirm an exemption for a cabinet-only job, as our kitchen remodel permits post explains. Refacing by itself touches no wiring or piping. Replacement usually does: the sink and disposal are disconnected and reconnected, under-cabinet lighting is rewired, and a moved appliance needs a new outlet or gas connection. The San Diego details are in our San Diego kitchen permit rules post.
What should a cabinet proposal and contract spell out?
Enough detail that two bids can be compared line by line. The Contractors State License Board lists cabinet work under the C-6 Cabinet, Millwork and Finish Carpentry classification. MDG Builders, CSLB #1040337, is a general contractor: we measure, specify and manage the job, and a licensed cabinet subcontractor does the refacing or installation. That subcontractor's license number and insurance certificate are yours to request.
The down payment is capped by state law. CSLB's page on home improvement contracts says it cannot be more than $1,000 or 10 percent of the contract price, whichever is less, with no exception for special-order materials. On an $8,250 refacing job, 10 percent is $825, which is less than $1,000, so $825 is the most a contractor may take up front.
See our Los Angeles kitchen remodeling and San Diego pages for local details. The same choice applies to vanities in a bathroom remodeling job.
- Linear feet, and the count of doors and drawer fronts.
- Door style and material, and the veneer or laminate for the frames, by product name.
- Whether drawer boxes, slides and hinges are new or reused.
- Box repairs included, and the price for any found later.
- Who disconnects and reconnects the sink, disposal and appliances.
Cabinet refacing questions
Kitchen remodel vs. refacing: which is better?
Refacing is better when you like the layout and the boxes are sound, because it changes the look and keeps the countertops and plumbing. A remodel is better when the layout, storage or appliances need to change.
How much does it cost to reface kitchen cabinets?
National figures from HomeGuide, last updated April 2023, put refacing at $150 to $450 per linear foot, or $5,000 to $13,000 for an average kitchen. Fixr's January 2026 page gives a similar $3,000 to $13,500.
Is painting cabinets cheaper than refacing?
Yes, painting generally costs less, because it reuses your existing doors and drawer fronts. It also changes less: worn edges, old door styles and tired hinges remain. We found no dated, method-backed price source for cabinet painting, so we do not quote a figure.
Can you reface cabinets and keep your countertops?
Yes, and that is the main reason refacing saves money. The cabinet boxes stay in place, so the countertops, sink and plumbing connections stay too. If you replace the boxes, the countertops have to come off, and stone or quartz tops rarely go back on new cabinets in one piece.
Does cabinet painting last?
It can last for years when the preparation is thorough and the doors are sound. Durability depends on degreasing, sanding, priming and a cabinet-grade finish. In homes built before 1978, paid workers who sand painted surfaces must follow the EPA's lead-safe rules.
Do I need a licensed contractor to reface cabinets in California?
For nearly any kitchen, yes. California's minor work exemption for unlicensed people covers only jobs under $1,000 including materials, and published refacing prices are several times that. Cabinet work falls under the CSLB C-6 classification.
Work that goes with this

Kitchen Remodeling
Cabinets, counters, layout changes, permits and a written schedule, with prices tied to named sources.
See kitchen remodeling →
Painting
Interior, exterior, stucco and cabinet painting with real prep, lead-safe rules followed and a written scope.
See painting →
Bathroom Remodeling
Showers, tubs, vanities and full baths, with the permit path, waterproofing and prices from named sources.
See bathroom remodeling →Keep reading
Quartz vs. Granite Countertops: Cost, Care and California's Silica Rules
Quartz or granite: dated prices, a 45-square-foot example, upkeep, and what Cal/OSHA's engineered stone silica rules mean for buyers.
Read the guide →
How Much Does a Kitchen Remodel Cost in California?
Sourced Los Angeles kitchen remodel prices for 2025 and 2026, why they disagree, and how to read a bid line by line.
Read the guide →How Long Does a Kitchen Remodel Take in Los Angeles?
A week-by-week kitchen schedule for Los Angeles: the LADBS permit step, cabinet and countertop waits, inspections and common delays.