Tarzana, CA · Serving Southern CaliforniaCSLB #1040337 · (888) 666-8224
Window costs

How Much Does Window Replacement Cost in Los Angeles?

Quick answer

A whole-house window replacement in Los Angeles typically runs $16,359 to $22,377, with an average of $19,356, according to Angi's July 2026 figures. Per window, national data from Fixr puts vinyl at $350 to $800 and fiberglass at $400 to $1,500. Window count, frame material, glass and stucco work decide where you land.

By MDG Builders · November 9, 2026

missing photo

What do replacement windows cost in Los Angeles right now?

Two dated sources price the whole job. Angi, the home services marketplace, updated its Los Angeles window replacement page on July 8, 2026. It reports an average of $19,356 and a typical range of $16,359 to $22,377, and says its numbers come from surveys of customers about what they paid. Remodeling magazine's Cost vs. Value 2025 report, published in September 2025, prices a vinyl window replacement project in Los Angeles at $23,783 and a wood window project at $27,913.

Angi averages real jobs of every size. Cost vs. Value prices one fixed reference project and does not publish its window count, so it cannot be turned into a per-window price. A single window is priced by its frame, its glass, its size and how it goes into the wall, so the sections below split the price that way. Our window replacement page explains the installation methods.

Cost

Window replacement price table for Los Angeles

Whole-house rows are Los Angeles figures from Angi and Cost vs. Value. Per-window frame rows are national figures from Fixr.

What it coversTypical rangeWhat moves the price
Whole-house job, Los Angeles$16,359 to $22,377 (average $19,356)Number of openings, frame material, wall repair
Cost vs. Value vinyl project, Los Angeles$23,783Fixed reference project; 83.2 percent recouped at sale
Vinyl frame, per window (national)$350 to $800Size, operating style, color
Fiberglass frame, per window (national)$400 to $1,500Size, finish, product line
Aluminum frame, per window (national)$200 to $800Thermal break, finish
Double-pane glass, per window, Los Angeles$500 to $2,000Unit size and coating
Tempered or laminated upgrade (national)$100 to $800 added per windowFire zone and safety glazing rules

How we got these numbers: Angi's Los Angeles window replacement cost page (updated July 8, 2026, from surveys of its customers), Remodeling magazine's Cost vs. Value 2025 report for Los Angeles (published September 2025, costs from Verisk XactRemodel), and Fixr's national window replacement guide (updated January 21, 2026). Confidence is medium for whole-house totals and lower for the national per-window prices. MDG's written proposal for your openings is the real price.

  1. Angi, window replacement cost in Los Angeles (2026)
  2. Remodeling Cost vs. Value 2025, Los Angeles (Zonda, costs from Verisk XactRemodel) (2025)
  3. Fixr, window replacement cost guide (2026)

What does one window cost by frame material?

We found no Los Angeles source that prices frames one by one and publishes a method, so the frame figures here are national. Fixr, a cost guide that says it draws on pricing databases, licensed contractors and industry experts, updated its window replacement page on January 21, 2026. Its installed prices per window are $200 to $800 for aluminum, $350 to $800 for vinyl, $400 to $1,500 for fiberglass, $300 to $2,500 for composite and $600 to $2,000 for wood.

Our comparison of vinyl, fiberglass and aluminum frames covers how each one behaves in heat and in fire zones.

How much does the glass package add per window?

Glass is the second price lever. Angi's Los Angeles page lists double-pane windows at $500 to $2,000 each, low-E glass at $300 to $1,100 and tempered glass at $200 to $700. Fixr's national table is close, with double-pane at $450 to $2,000 and triple-pane at $1,000 to $4,000, and it adds that a tempered or laminated upgrade can add $100 to $800 to a window.

In the City of Los Angeles you cannot skip the first upgrade. The Department of Building and Safety requires labeled dual glazing on replacement windows in homes of three stories or less, so single-pane prices do not apply to a permitted job.

A worked example: twelve windows on a San Fernando Valley ranch house

Take a single-story house with twelve openings, all staying the same size. With Fixr's vinyl range, the windows come to 12 x $350 = $4,200 at the low end and 12 x $800 = $9,600 at the high end. In fiberglass the same list is 12 x $400 = $4,800 up to 12 x $1,500 = $18,000. Angi's Los Angeles double-pane range gives 12 x $500 = $6,000 up to 12 x $2,000 = $24,000, which brackets both.

Now suppose the house sits in a mapped fire hazard zone and every unit needs a tempered pane. Using Fixr's upgrade figure, that adds 12 x $100 = $1,200 to 12 x $800 = $9,600. A vinyl job that started at $4,200 to $9,600 becomes $5,400 to $19,200.

Which Los Angeles rules change the price of a window job?

Four rules reach the invoice. The first is the permit: a same-size, same-type change-out is an Express Permit with no plan check, while a new or resized opening needs drawings. Our guide to window permits in Los Angeles sorts the cases. The second is the Energy Code, which caps the U-factor and solar heat gain on the label, covered in our Title 24 window guide.

The third is fire. The LADBS Fire Hazard Severity Zone checklist, revised March 27, 2026, calls for multilayered glazing with at least one tempered pane on exterior windows. Ask LADBS whether a window-only swap triggers it at your address. The fourth is lead: the EPA says anyone paid to disturb paint in a home built before 1978 must be certified in lead-safe work practices.

Retrofit insert or full-frame: which quote are you holding?

Two bids for the same house can describe different work. A retrofit, also called an insert or pocket installation, leaves the old frame in the wall and sets a new unit inside it. Fixr notes that this can lower the cost when the existing frame is sound. A full-frame replacement removes everything down to the rough opening and uses a flanged new-construction window, which on a stucco house means cutting back the stucco, flashing the opening and patching the wall.

That patch is its own line. Stucco repair and exterior painting to blend it are often left out of a window-only bid. A remodel that is already opening walls for a room addition is the cheapest moment to go full-frame.

Ask every bidder to write the word retrofit or full-frame next to each opening.

Do new windows pay back at resale, and is the tax credit still available?

Resale recovers most of it on paper. Cost vs. Value 2025 for Los Angeles shows the $23,783 vinyl project returning $19,799 at sale, or 83.2 percent, so $23,783 - $19,799 = $3,984 is not recovered. The wood project recoups 81.9 percent, and the national vinyl figure is 75.5 percent.

The federal credit is gone. The IRS page for the Energy Efficient Home Improvement Credit, updated April 28, 2026, limits it to windows placed in service before December 31, 2025, so a bid that still subtracts it is out of date. We did not verify any current state or utility rebate.

What should a window proposal list before you sign?

A window count and a total are not enough to compare bids. MDG Builders, CSLB #1040337, writes the scope, pulls the permit and runs the schedule, and a licensed specialty subcontractor installs the windows. You can ask for that subcontractor's license number and certificate of insurance, and our guide shows how to look up a contractor license.

State law also limits what you pay up front. Business and Professions Code section 7159 caps a home improvement down payment at $1,000 or 10 percent of the contract price, whichever is less. At Angi's $19,356 average, 10 percent would be $1,936, so the cap that applies is $1,000. The cap is the same in Los Angeles, Glendale and Santa Monica.

  • Each opening by room, with size, operating style and retrofit or full-frame.
  • Manufacturer, product line and frame material.
  • U-factor and SHGC for each unit, matching the NFRC label.
  • Which panes are tempered, and why.
  • Stucco, trim and paint repair, included or excluded.
  • Permit fee, who pulls it, and haul-away of the old units.
FAQ

Window cost questions

How much does it cost to replace windows in Los Angeles?

Most whole-house jobs fall between $16,359 and $22,377, with an average of $19,356, based on Angi's July 2026 survey figures for Los Angeles. Cost vs. Value 2025 prices its vinyl reference project higher, at $23,783. A short list of same-size openings can cost much less.

What is a reasonable price for one replacement window?

For a standard vinyl unit, $350 to $800 installed is the national range Fixr published in January 2026, and fiberglass runs $400 to $1,500. Los Angeles quotes tend toward the upper half. Tempered glass, custom shapes, second-story access and stucco patching push a single opening higher.

Why is window installation so expensive?

Because the price covers more than the unit. Fixr estimates labor at about 30 percent of the total, at $150 to $300 for a small window and up to $800 for a bay or bow, before the permit, disposal and wall repair.

Is 10 windows for $20,000 worth it?

That works out to $2,000 per window, the top of Angi's Los Angeles double-pane range of $500 to $2,000. It can be fair for fiberglass or wood units with tempered glass and full-frame installation. For standard vinyl retrofits it is high, so ask for an itemized bid.

Do new windows increase home value in Los Angeles?

They recover most of their cost on paper. Cost vs. Value 2025 estimates that a $23,783 vinyl window project in Los Angeles adds $19,799 at resale, or 83.2 percent. The figure comes from a survey of real estate professionals and describes a reference project, not your house.

Is there still a federal tax credit for replacement windows?

No. The IRS states that the Energy Efficient Home Improvement Credit applies only to windows placed in service before December 31, 2025. While it lasted, the window portion was limited to $600. We did not confirm any current California or utility rebate for windows.

Services

Work that goes with this

Windows by city

Painting by city

Room Additions by city

Ready to plan your project?

Call or send the form. We schedule a site visit and send a written proposal.

Call (888) 666-8224